Project Details
Start Date :
01 May 2017
Completion Date :
01 February 2018
Contract Value :
QR. 12,571,769.29
Client :
UNITED DEVELOPMENT CO.
Contact Info
  • 6th Floor, Al Mana Plaza, Qatari Bin Fujaah St, Bin Mahmoud . PO Box 7098, Doha Qatar
  • +974 4419 0333
  • +974 4441 8249
  • Info@Petroserv-limited.com

Description

  • The Works comprise the construction of the following works by no way of limitation
  • Construction of new wastewater collection system to serve Isola Dana Plots
  • Gravity network with all necessary piping, manholes, house connections and connection to existing networks and plots
  • Force mains including connection to existing force main installed along the Isola Dana bridge
  • Sewage Discharge Chambers, Connection to existing manholes
  • Two sewage pumping stations, Power supply to the two pumping stations as specified and shown on the drawings
  • Telecommunication connections to the two pumping stations as specified and shown on the drawings.
  • Reinstatement of the road pavement and streetscape along sidewalks to their original conditions